Working Method Of Improving Machine Efficiency Of Drilling Rig

Drill Rig in the project has an important application, in the process of operation, want to improve the efficiency of Drill Rig is a lot of relevant technical personnel want, there are many methods, the following to introduce you to improve the drilling machine efficiency method.

Before Drill Rig work, must inspect each part, the clear water enters the well tube by the filtration hole, and tries to run each body, confirms the normal, the square can work.

Piling sites require smooth, solid, dust-free, no high-voltage, barrier-free, the well should not be too deep, general 8-12m more appropriate, no empty underground, no burial, no water after the rain, when the dynamic level from the ground SM above, do not choose the well type, and should be set up a safe works, prohibit pedestrians, enter or stay, The sleepers shall be laid on a solid and flat ground, the rail grounding resistance is not greater than 10, and the rail distance deviation shall not exceed 0.6cm, the rail joint plate connection must be firm.

There is a strict stipulation on the operation of the drilling machine. For example, the most basic requirements of Drill Rig is that operators must hold certificates, so in the drilling before the large-grain salt into the flower tube, comply with safety regulations and safe production of ten disciplines, so that the filter water hole does not plug, into the well after the salt slowly dissolved.

Power cords, motors and knives are properly connected and insulated, the voltage deviation shall not exceed +5%, the construction of small-caliber tube well, generally uses the small-sized drill hole to have the certain depth, will the processing good wall tube down to the well, if two electric motors must simultaneously operate, should separate a certain time to start the plate standing pile frame, when the board Ultra ~ 20cm, should stop check, all parts of the normal rear can continue to rise.

The above is to improve the efficiency of Drill Rig introduction, I believe that through the above explanation, many people will improve the drilling machine methods have more understanding, I believe many people can gain.


Feedback
Contact Us
Address: Jingye Road, Dongshan Economic Development Zone, Ruian City, Zhejiang Province,China
Tel: +86-577-66688101
Fax: 0577-65539928
E-mail:zenzoom@zhenzhong.com
Home | About Us | Products | News | Exhibition | Contact Us | Feedback | Mobile | XML